Wind Farm Details by County
Irelands total capacity is 4339.17MW generated from 331 wind farms in 30 counties.
Galway
Capacity: 284.63MW
Number of Windfarms: 8
Knock South (Inverin)
Company: | Fuinneamh Geoithe Teo |
---|---|
Capacity: | 2.64MW |
Commision Date: | 1999 |
Turbine Details: | Vestas 5 x V47 660 |
Contact: | Sean O'Foighil 00 353 (0) 91 553480 |
Sonnagh Old
Company: | Sonnagh Old Windfarm |
---|---|
Capacity: | 7.65MW |
Commision Date: | 2004 |
Turbine Details: | Vestas 9xV52 850 |
Contact: | Frank O'Domhnaill 00353 (0)94 954 8281 |
Derrybrien
Company: | ESB Wind Developments |
---|---|
Capacity: | 59.50MW |
Commision Date: | 2005 |
Turbine Details: | Vestas 70xV52 850 |
Contact: | 00353 (0)1 611 4257 |
Knock South (2) (Inverin II)
Company: | Fuinneamh Geoithe Teo |
---|---|
Capacity: | 0.69MW |
Commision Date: | 1999 |
Turbine Details: | 1 x Vestas V47 |
Contact: | Sean O'Foighil 00353 (0) 91 553480 |
Leitir Guingaid
Company: | Invis Energy |
---|---|
Capacity: | 40.90MW |
Commision Date: | 2014 |
Turbine Details: | 17 X Enercon E82 turbines |
Contact: |
Galway Wind Park (Ugool (1))
Company: | SSE Renewables |
---|---|
Capacity: | 64.00MW |
Commision Date: | 2016 |
Turbine Details: | |
Contact: | Mark Coleman +353 (0)1 655 6514, +353 (0)87 932 3625 mark.coleman@sse.com |
Seecon (1)
Company: | tbc |
---|---|
Capacity: | 105.00MW |
Commision Date: | 2011 |
Turbine Details: | tbc |
Contact: | tbc tbc |
Cloonlusk Wind Farm
Company: | tbi |
---|---|
Capacity: | 4.25MW |
Turbine Details: | |
Contact: | tboi tbi |